We walked through on the revisions of the permit, we recently submitted. Went though what still needed to be addressed and fixed. We got the go ahead, to dry wall in the walls that are framed up. With a partial completion on the permit. Still to be addressed, the bathroom is to become wheel chair compliant (per the commercial space law in Washington state). This requires the hot water tank to be moved, a wall to be removed, and the door relocated.Up stairs a door for separation from the up stairs and down stairs will be installed.
It was a good day.
My Contractor was sick at home and couldn't be here today. I did my best to handle the walk through and facilitate our next move with Robert, the inspector.
Keep ya posted as more comes.
thanks,
Suzie
Can't wait for the job to be complete!